AgriPulse Weekly Progress

Generated from git log
Aug 3 – Aug 7, 2026  ·  repo agripulse

This week we completed the entire specification audit. All 13 checkpoints are now clear — every data contract, pipeline rule, infrastructure decision, and project document has been verified and reconciled. The project is ready to move from data primitives into functional specifications.

Milestone: Specification Audit Complete

All 13 reconciliation checkpoints (R-00 through R-12) have been cleared. Phase 0 (The Blueprint) and Phase 1 (The Ground Truth) are fully reconciled. The repository now contains zero known conflicts between its normative documents, and every specification is backed by automated validation. The project is cleared to begin Phase 2: specifying the procurement engine and user journeys.

At a Glance


8
Changes saved
across 5 working days
17,678
Lines of spec written
90% brand-new content
139
Documents touched
5 architecture decisions
13/13
Audit gates cleared
R-10 through R-12 + post-audit

Audit Progress


All 13 checkpoints are now complete. Green gates were cleared in previous weeks; yellow gates were cleared this week. The specification is fully reconciled.

R-00
R-01
R-02
R-03
R-04
R-05
R-06
R-07
R-08
R-09
R-10
R-11
R-12

13 of 13 checkpoints complete · audit closed · functional specifications begin next week

Key Highlights


Commit Velocity


0 1 3 2 1 1 1 3 Mon Aug 3 Tue Aug 4 Wed Aug 5 Thu Aug 6 Fri Aug 7
Friday spike reflects the audit closing sequence: repository reorganization, governance framework, and the final quality sweep — all shipped in one day.

Full Commit Log


Hash Scope Description Gate
Friday, Aug 7 — 3 commits  ♦  Audit Closed
e6ee8bb repo Post-audit corrections across schemas, test data, validators, and specs — 3,220 lines post
dc506a7 workflow Add implementation readiness governance and 5 founding amendments — 589 lines gov
ad150c9 repo Reconcile visual grammar, README, context; move specs to specs/341 lines R-12
Thursday, Aug 6 — 1 commit
bcc5747 architecture Rebuild Cloudflare stack as 5 formal architecture decision records — 393 lines R-11
Wednesday, Aug 5 — 1 commit
c5e44df ingestion Enforce external intelligence invariants — 5,252 lines R-10
Tuesday, Aug 4 — 1 commit
6b6c45c ingestion Add external acquisition and intelligence test data and validation — 3,034 lines R-10
Monday, Aug 3 — 2 commits
59f066a ingestion Refine external adapters, source profiles, and correlation test data — 1,125 lines R-10
71e2d3d ingestion Complete external acquisition, correlation, and certification lifecycle — 3,724 lines R-10

Current Status


What's Next


Phase 2 — The Procurement Engine

  • 2.1 Role and permission rules. Define who on the buying team can see what data and perform which actions, with suppliers locked out until explicitly invited.
  • 2.2 Procurement funnel logic. Build the state machine that narrows a list of 15 candidate suppliers down to 3 for sample evaluation, and finally to the 1–2 selected for award.

Phase 3 — Functional User Journeys

  • 3.1 Natural-language search → HS code. Users type what they need in plain language, and the system maps it to the correct trade classification to find price, quantity, and lead time.
  • 3.2 RFQ generation and vendor negotiation. The workflow for sending requests for quotation, negotiating prices, and defining shipping terms (Incoterms).
  • 3.3 Sample compliance and lab testing. An audit trail for collecting product specifications, lab results, and compliance sign-offs before awarding a contract.
  • 3.4 Crop yield and price forecasting (Goal 2). The user journey for interacting with the predictive model that correlates satellite crop data with yield volume and price risk.

Three-Week Summary


Week Focus Changes Lines Gates
Week 1 Project founding and blueprint 31 13,580 R-00 – R-04
Week 2 Data pipeline specification repair 6 16,780 R-05 – R-09
Week 3 External sources, governance, audit close 8 17,678 R-10 – R-12
Total (3 weeks) 45 48,038 13/13 ✓